It is reported that TSMC's 2nm process acceleration installation equipment is expected to be mass-produced in 2025
hackcomeing
发表于 2024-3-25 10:16:00
3901
0
0
According to reports, TSMC's 2nm process acceleration installation equipment is expected to be mass-produced in 2025. The semiconductor supply chain reports that TSMC's Baoshan Fab20 P1 plant in Hsinchu will begin equipment installation work in April to warm up the GAA (Surrounding Gate) architecture for mass production. It is expected that Baoshan P1, P2, and Kaohsiung's three advanced process wafer factories will all be mass-produced in 2025, attracting customers such as Apple, Nvidia, AMD, and Qualcomm to compete for production capacity. TSMC will not comment on this.
CandyLake.com 系信息发布平台,仅提供信息存储空间服务。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
猜你喜欢
- World Advanced and NXP Singapore Joint Venture Wafer Plant Groundbreaking Expected to Mass Produce by 2027
- TSMC expects to start mass production of 2nm process in the second half of next year
- Baidu and Geely have started the internal transfer process to pay social security for employees of Jiyue in November
- TSMC's 2 nanometer process technology details revealed, performance jumps by 15%, power consumption decreases by 30%
- Guo Mingchi: Apple M5 series chips will adopt TSMC N3P process, which entered the prototype stage several months ago
- Has FX received a total of $60 million in financing within three months and is it going to mass produce this time?
- What is the impact of the Biden administration's 301 investigation on China's mature process chip industry?
- Hesai Technology announces that the cumulative production of designated models has exceeded 100
- Trial production is progressing smoothly, and TSMC's 2nm is expected to enter mass production as scheduled