首页 News 正文
Volkswagen (VOY.XE) has decided that it no longer needs to build a new plant in Wolfsburg-Valmenau, Germany, after tweaking its production schedule for new electric vehicle models for its namesake passenger car brand.
The German auto giant said on Friday that the Trinity car project, originally planned to be built in Wolfsburg-Valmenau, Germany, will move to its Zwickau plant, also in Germany.
Volkswagen said it expects a fully electric sport utility vehicle (SUV) to start rolling off the assembly line at its Wolfsburg plant in 2026, adding to the output of the ID.31 electric car that is ramping up production this year.
New electric vehicles based on the so-called scalable system platform architecture will also be built at the main Wolfsburg plant, and these new models will be launched in 2030, Volkswagen said. The new generation Tiguan and future electric versions of the Golf will also be produced at the Wolfsburg plant, the company said.
The company said the new vehicle allocation plan, which will last until 2028, will help boost the competitiveness of the Volkswagen brand.
A Volkswagen spokesman said the plans would have no impact on jobs.
标签: Seburg Volkswagen Wolf
CandyLake.com 系信息发布平台,仅提供信息存储空间服务。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

123458071 新手上路
  • 粉丝

    0

  • 关注

    0

  • 主题

    3