首页 News 正文

On February 5th, Boeing announced on Sunday that it will rework approximately 50 undelivered 737 MAX aircraft, as its supplier, inevitably Rui Aviation Systems, has discovered two incorrectly drilled holes on some of the fuselage, which may delay delivery in the near future. Boeing emphasizes that the existing 737 aircraft can continue to fly without affecting safety. (Reuters)
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

本兮我爱你 新手上路
  • 粉丝

    0

  • 关注

    0

  • 主题

    2