首页 News 正文

[Institution: Nvidia launches B200A targeting OEM customers, with an estimated annual increase of 55% in high-end GPU shipments by 2025] According to TrendForce Consulting, Nvidia still plans to launch B100 and B200 in the second half of 2024 to supply CSPs (cloud service providers) customers, and plans to gradually supply them after the third quarter of 2024. While the yield and mass production of CoWoS-L still need to be improved, Nvidia is simultaneously planning to downgrade the B200A to other enterprise customers and switch to using CoWoS-S packaging technology. The memory specification of B200A will adopt 4 HBM3e (fifth generation high bandwidth memory) 12hi (12 layer stack), with a total capacity of 144GB. It is expected that OEMs (original equipment manufacturers) will officially receive the B200A chip in the first half of 2025. By 2025, the Blackwell platform will account for over 80% of Nvidia's high-end GPUs and drive the annual growth rate of Nvidia's high-end GPU series shipments to 55%.
CandyLake.com 系信息发布平台,仅提供信息存储空间服务。
声明:该文观点仅代表作者本人,本文不代表CandyLake.com立场,且不构成建议,请谨慎对待。
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

楚一帆 注册会员
  • 粉丝

    0

  • 关注

    0

  • 主题

    38